Suzuki e-Access STD Running Cost
₹0.36/km on home charging · ₹355/month for 1,000 km · full charge ₹27 · real range ~76 km.
Cost breakdown
Charging cost = battery × tariff × 1.1 (losses) ÷ real range. Public DC charging at ₹20+/unit roughly doubles per-km cost.
Savings for your running
Petrol / yr
₹82,400
EV charging / yr
₹4,266
You save / yr
₹78,134
Frequently asked questions
What is the running cost of Suzuki e-Access STD per km?
About ₹0.36/km on home charging at ₹8/unit with 10% charging loss, based on a ~76 km real-world range from its 3.07 kWh battery. Public fast charging roughly doubles this.
How much does a full charge of Suzuki e-Access STD cost?
A 0–100% home charge needs ~3.4 units including losses, costing about ₹27 at ₹8/unit.
What is the monthly charging cost of Suzuki e-Access STD?
At 1,000 km/month it costs about ₹355/month on home charging — roughly ₹6,511 less than a petrol car doing the same distance.