# PMO Adviser Calls for Utility Coordination to Speed Up EV Charging

> A Prime Minister's Office adviser has urged closer coordination between state power utilities and charging operators to speed up public EV charger installation. The adviser also hinted that additional central funding may be considered for the rollout.
- **Author**: Prakash Reddy
- **Published**: 2026-11-22
- **Modified**: 2026-11-22
- **Category**: news
- **URL**: https://bestev.in/news/pmo-adviser-calls-for-utility-coordination-to-speed-up-ev-charging-941acf73760447219221b15c28da52e1

---

## Push for Better Coordination

A Prime Minister's Office adviser has urged state power distribution companies, known as DISCOMs, to work more closely with teams building public electric vehicle charging points. The aim is to speed up the rollout of charging infrastructure across the country.

## Funding Signal

The adviser also indicated that additional funding could be considered to support the expansion. However, no amount, timeline or scheme name has been shared publicly. The signal should be treated as an intent, not a confirmed allocation.

## Why DISCOMs Matter

Every public charger needs a power connection, sanctioned load and metering before it can start operating. Delays at the utility level are a known bottleneck for charging operators. Faster approvals and standard processes can shorten project timelines.

DISCOMs also set tariffs. Clear and uniform EV charging tariffs help operators price sessions predictably, which in turn keeps costs stable for drivers.

## Impact on EV Buyers

India's electric vehicle sales have grown across two-wheelers, three-wheelers and cars. Range anxiety still holds back many buyers, especially those without home parking or access to a private charger.

More public chargers on highways and inside cities directly address that worry. Faster utility approvals mean more stations going live within the same financial year.

Reliable charging also supports fleet operators, cab aggregators and small logistics firms that need predictable uptime to run electric vehicles profitably.

## What to Watch

Formal communication from the power ministry or the PMO on utility-level charging guidelines is expected. Any funding announcement would likely come through an existing central scheme rather than a new one.

Until then, the signal is directional. Buyers should treat it as a positive policy hint, not a confirmed rollout date.

---
- [More news articles](https://bestev.in/news/category/news)
- [All articles](https://bestev.in/news)